Case Studies
ZMS Cable plays a key role in delivering cable solutions to leading organizations around the world, across a breadth of industries. From challenging geographic locations to short lead-times and innovative customized solutions, our technical expertise, customer service and logistical experience make us enable to supply cables and cable accessories for some of the world's most prestigious projects.
Below is a small selection of the projects we have worked on in your industry.
Transmission, Distribution & power networks
Pakistan Government of Sindh to bid out Build-Own-Operate-Transfer (BOOT)
- PROJECT SCOPE
- Building a Landmark two Gas Based Power Plants of 50 MW each which shall be developed at SITE, Nooriabad to cater to power shortage at Nooriabad, and adjoining areas. The Project is an important part of the Government’s strategy towards developing indigenous power in Sindh to cater to the needs of the province through promotion of industrialization and to increase the well-being of the residents of the province.
- REQUIREMENT:
- A comprehensive array of ACSR conductors and MV power cables for this projects.
- ZMS CABLES SOLUTION:
- We, ZMS cable worked closely with BOOT to supply varieties of ACSR conductors and MV power cables , tailored specifically to the needs of this project. Intensive technical assistance made it possible to meet the strict delivery times and ensure the project was a success
AIRPORTS
Ecuador Airport lighting-Construction of a new runway
- REQUIREMENT:
- Airfield lighting, secondary circuit
- ZMS CABLES SOLUTION:
- ZMS Cable was able to deliver within the four-week deadline when other suppliers could only commit to eight weeks
BUILDING & CONSTRUCTION
Jordan Real Estate-Power and control system of 9 buildings
- REQUIREMENT:
- BS standard Low voltage power cable from 6mm2 to 630mm2
- BS standard Control cable from 2.5mm2 to 16mm2
- BS Standard Electric wire from 1.0mm2 to 10mm2
- ZMS CABLES SOLUTION:
- ZMS Cable was arranging the production of 10 containers wires and cables within 21 days and all the cables to be board with 3 days.
MARINE & OFFSHORE
Bangladesh BREB-Convey power from a 11kV overhead line via fresh or tidal submarine route to another overhead line.
- REQUIREMENT:
- Three core submarine cable supplying medium voltage power
- ZMS CABLES SOLUTION:
- ZMS Cables was one of the few suppliers able to provide this very complex submarine cabling and was able to commit to, and achieve, better delivery times than anyone else
MINING, DRILLING & TUNNELLING
MongoliaThe Oyu Tolgoi Mining-Construction of power generation unit
- REQUIREMENT:
- Power, control and instrumentation cable
- ZMS CABLES SOLUTION:
- Extensive range of cable ready for immediate land transportation
- Expedited delivery due to experience of country's import land tax
- Cables delivered within 15 days of order placement
OIL, GAS & PETROCHEMICALS
Iraq Badra oil field-Power &Fiber optic cable supplying and laying of Badra oil field
- REQUIREMENT:
- Supply of Power cable and Fiber optic cables required within four weeks.
- ZMS CABLES SOLUTION:
- ZMS Cables' technical experts worked with the specifiers to identify a cable solution that would provide the necessary performance and meet the rigorous demands of the environment.
- The cables were then manufactured and shipped within 2 weeks from order.
- All five containers reached destination within the required four weeks allowing the upgrade work to be carried out as scheduled.